Schedule Now
1-877-50-FLOOR Schedule now

My floor installation was a 2-day job. I had my entire home retiled. The team that took up the old tile was very professional and explained the process for removing the old tile. They move and put-up plastic to protect the furniture. the next day another team came in to lay the new tile down. I was asked if the right tile was ordered before installation. I was showed how the tile was to be laid. The team again was very professional and consulted with me during the entire floor laying process. My floors look beautiful.

Previous ArticleJason Delehay Next ArticleJAQUETTA
Questions or Feedback ?>
Beeswax Tracking