I had carpet and ceramic tile on my mail level. The installer from 50 floor was able to remove everything thing from the floor and install the hard wood floor in a day and 1/2. I was a little frustrated that the guys doing the install did not speak English very or they pretend that they didn’t. We dealing with the public 50 floor need to ensure there is someone that can speak and comprehend English. They did a good job other than that



