Schedule Now
1-877-50-FLOOR Schedule now

We had all flooring in our 3600 sq. ft. house. 50Floor required about two weeks lead time from signing of contract to installation. They arrived on time and completed the work in the three days that we were told it would take. The dust was minimal and the cleanup complete. The only snafu was a toilet that had to be removed. The 50Floor crew was not qualified to replace it, so we had to hire our own plumber and pay him to install the toilet. 50Floor will reimburse us for those costs. We love our new floors and highly recommend 50Floor for quality and cost.

Previous ArticleNick Next ArticleBeth Watkins
Questions or Feedback ?>
Beeswax Tracking