My floor installation was a 2-day job. I had my entire home retiled. The team that took up the old tile was very professional and explained the process for removing the old tile. They move and put-up plastic to protect the furniture. the next day another team came in to lay the new tile down. I was asked if the right tile was ordered before installation. I was showed how the tile was to be laid. The team again was very professional and consulted with me during the entire floor laying process. My floors look beautiful.



